60 | MAR | which is the pole at A_OneE and then at U_OneE did we run photometrics for that new connector road way ? |
which.REL is.V.3S.PRES the.DET.DEF pole.N.SG at.PREP name and.CONJ then.ADV at.PREP name did.V.PAST we.PRON.SUB.1P run.V.1P.PRES photometric.ADJ+PV for.PREP that.DEM.FAR new.ADJ connector.N.SG road.N.SG way.N.SG | ||